Completion date | Completion Date | -------------------------------------- | June 2005 |
| Usage | -------------------------------------- | Office and commercial |
| Parking space | -------------------------------------- | 333 nos.(317nos.:B1F-B4F,16nos.:GF) |
|
|
|
|
Floor distribution | Total GFA | -------------------------------------- | Approximately 70,000 ㎡ |
| Building height | -------------------------------------- | 168 m |
| Floor distribution | -------------------------------------- | Lobby: 1F & MF
Low zone: 2F-18F High zone: 20F-33F |
| Standard floor area | -------------------------------------- | Approximately 2,550-2,650 ㎡ |
| Floor height | -------------------------------------- | 2.8 m |
?????????
|
|
|
|
Facilities | Raise floor height | -------------------------------------- | 150 mm |
| Suspended ceiling | -------------------------------------- | Mineral wool board
|
| Floor load | -------------------------------------- | 500 kg/㎡ |
| Curtain wall system | -------------------------------------- | Low-Radiation glass |
|
|
|
|
Elevator | Passenger elevator | -------------------------------------- | 14 elevators · capacity: 1,800kg, brand: OTIS |
| Speed | -------------------------------------- | low zone: 3.5m/s · high zone: 5m/s |
| Freight / fire elevator | -------------------------------------- | 2 elevators · capacity: 1,800kg, brand: OTIS |
???????????????????????
| Garage elevator B4F-1F | -------------------------------------- | 2 elevators · capacity: 1,000kg, brand: OTIS |
| Transfer Freight elevator B1F-1F | -------------------------------------- | 1 elevator · capacity: 2,000kg, brand: OTIS |
|
|
|
|
Power Supply | Eletricity supply | -------------------------------------- | Dual-line power supply. 100% overload operation for each main line |
| Normal power supply | -------------------------------------- | 68 VA/㎡ |
| Emergency power supply | -------------------------------------- | 44 VA/㎡ |
| Backup generator | -------------------------------------- | Provides up to 40% of normal power supply, continuous power for at least 6 hours |
|
|
|
|
Air Condition | *HEPA F7 High efficiency filter · filtering PM2.5&dust · SGS air quality inspection certificate |
| VAV air-condition system | -------------------------------------- | Contralled by the building |
| 24hrs chilled water supply | -------------------------------------- | Office floor available |
| Ventilation | -------------------------------------- | 3.8m3/h/㎡ |
| Carbon monoxide detection system | -------------------------------------- | In the basement |
|
|
|
|
Communication | Service provider | -------------------------------------- | China Mobile · China Telecom · China Unicom |
| Cable TV | -------------------------------------- | Available |
|
|
|
|
Pubilc Facilities | Hot water supply | -------------------------------------- | Available in all restrooms |
| Pantry | -------------------------------------- | Available on each floor |
| Disabled toilet | -------------------------------------- | Available on each floor |
|
|
|
|
Security System | Main Entrance lobby gate | -------------------------------------- | IC card contral system |
| CCTV | -------------------------------------- | 24 hours |
|
|
|
|